A floor cover was ordered for the steps leading to one of the southeast dumpsites, but construction was delayed after noticing some clothes on the stairwell that was about to be blocked. Captain of the Guard Urdim Channeltree wasn't paying attention and ventured too close to the danger zone. Luckily, he only suffered a broken arm.

No comments:
Post a Comment